In January 2014 Indonesia stopped exporting raw nickel ore. The idea was that if the ore could not leave, the smelters would have to come, and they did: mostly Chinese-financed industrial parks on the coasts of Sulawesi and Halmahera, each with its own port, its own coal power station and tens of thousands of workers. Indonesia mined about a sixth of the world’s nickel in 2013. In 2025, by the USGS’s estimate, it mined two-thirds.

The ban shows in the output as a dip, not a rise. Exports stopped before there was anywhere at home to smelt the ore, so production fell by more than half in two years. It recovered once the first parks were running, sagged again in 2020 when a three-year exemption for low-grade ore ended, and has climbed every year since.

Fig. 01 · Indonesia’s nickel mine output, thousand tonnes of nickel, and its share of the world’s (USGS)
05001,0001,5002,0002,500Ore export banLow-grade exports allowedBan reimposed2013201420152016201720182019202020212022202320242025
Percentages are Indonesia’s share of world mine output · pale bars are estimates · USGS Mineral Commodity Summaries, 2015–2026 editions

Six sites, thirteen years

Landsat 8 has photographed every point on Earth every sixteen days since 2013, and Landsat 9 has doubled that since late 2021. Over Sulawesi and Halmahera most of those pictures are cloud. But taking every cloud-free pixel from a year and keeping the middle value gives one clear picture per year, and putting thirteen of them in a row shows the boom happen.

The figure below does that for six sites. Five are the new hubs: the Indonesia Morowali Industrial Park (IMIP) in Central Sulawesi; the Indonesia Weda Bay Industrial Park (IWIP) on Halmahera; Harita’s plants at Kawasi on Obi Island; the Virtue Dragon and Obsidian smelters at Morosi in Konawe; and Pomalaa in Kolaka, where Antam has smelted ferronickel for decades and a new Huayou–Vale plant is being built. The sixth is Sorowako, the Vale mine that has worked the same hills since 1968. It is the baseline, a nickel operation that did not boom. The small map of Indonesia in the figure shows where each one is; click a dot to switch to it.

Fig. 02 · Six nickel sites from Landsat, one cloud-free composite a year since 2013
Loading imagery…

Cleared land is anything in the frame that is neither vegetation nor water: pits, roads, stockpiles, roofs and tailings, but also towns and beaches, which is why the first year is not zero.

USGS/NASA Landsat 8 and 9 surface reflectance via Google Earth Engine · median of each year’s cloud-free pixels, gaps filled from the years either side · cleared = NDVI below 0.3, not water

Morowali is the oldest of the new parks and the one to start with. In 2013 the frame is forest, a coast road and a few small pits, with a patch of cleared ground by the shore where the first smelters would go. Press play and the park fills the bay: the coal plant and jetties at Labota, row after row of smelter roofs, and pits climbing the hills behind. About 5 km² of the frame was bare in 2013 and nearly 37 km² in 2025, almost eight times as much.

Weda Bay starts later and grows faster. Until 2018 the frame is almost all rainforest, with about 2 km² of bare ground in villages and along the shore. The park’s company was set up in August 2018, its first lines ran in early 2020, and by 2025 there were nearly 42 km² of cleared land, more than at Morowali, in a park five years younger. Switch on the year-cleared colours and the pattern is clear: the coastal flat went first, then roads reached up the valleys to the pits, and every year since has added a new band.

Obi follows the same course a year or two behind Weda Bay, from about 7 km² to about 33. Konawe grew to about 13 km² by 2019 and has barely changed since. Its owner, Jiangsu Delong, went into debt restructuring in 2024, and some of its smelters stood idle in 2025. Pomalaa barely changed for a decade, because Antam’s ferronickel plant has been there since the 1970s, and then jumped from 20 km² to 26 in 2025. Most of the new ground is one flat rectangle with a grid of roads, about 8 km south of the old plant: the shape of an industrial park being laid out. The Huayou–Vale plant at Pomalaa was reported to be about a third built in July 2025.

Sorowako is the control. Vale has mined and smelted there since 1968, and its cleared area was about 14 km² in 2013 and is about 14 km² now. The pits move across the hills, but old ones appear to be replanted about as fast as new ones open, which none of the boom sites has done.

Fig. 03 · All six sites on one scale, year by year
km²
00.20.40.60.81201420162018202020222024
Loading…
Landsat 8 and 9, as in Fig. 02 · each site’s frame is a different size, so compare the growth more than the level

Lit up

Put all six sites on one chart and the order of the boom is plain. Morowali grows first, from 2015. Weda Bay and Obi take off together after 2019, and by 2024 Weda Bay has more cleared land in its frame than Morowali does. Konawe rises and then flattens, Pomalaa waits, and Sorowako drifts along the bottom.

The night lights tell the same story with more contrast, because a forest is dark and a smelter town is not. Weda Bay’s frame went from almost no light at all, about 10 units in 2016, to 8,500 in 2025. Morowali’s rose from under 200 in 2013 to more than 15,000, now twice as bright as Sorowako, which was the brightest place in the set for its first nine years. Konawe peaked in 2022 and has dimmed by about a third since, which fits a park whose owner is restructuring its debts. Pomalaa only brightened in 2025, the same year as its new clearing.

Coal under the batteries

The parks run on their own power. Captive coal, meaning power stations built for one industrial user and not connected to the national grid, is how the smelters were built so quickly, and in the nickel provinces it grew from about 3 GW in 2019 to about 16 GW in 2025, by the Centre for Research on Energy and Clean Air’s count. Burning coal makes nitrogen dioxide, which the TROPOMI instrument on Sentinel-5P has measured daily since 2018.

Fig. 04 · Nitrogen dioxide over Sulawesi and Halmahera, annual mean of the tropospheric column
20406080+
µmol/m²
Loading…
Copernicus Sentinel-5P TROPOMI, offline L3 product via Google Earth Engine, 0.05° grid · the column over clean ocean here is about 10–15 µmol/m² and is left unshaded

In 2019 the map is nearly blank: a faint smudge over Morowali and nothing at Weda Bay. Each year the Morowali plume darkens and spreads along the coast, and by 2025 the strongest cell is about 118 µmol/m², several times the clean-air background. It is not the only source on that coast. By 2025 the map has its own hotspots about 75 km north-west of IMIP, at the Indonesia Huabao Industrial Park and its Ambunu coal plant, and about 35 km south, at the International Green Industrial Park, neither of which is in the six frames. The second-strongest cell on the whole map, 59 µmol/m², is further north-west again, by Tomori Bay in North Morowali, where OpenStreetMap shows no power station at all. Weda Bay appears in 2021 and is clearly visible by 2023. Konawe’s plume grows to 2022 and then fades, matching its lights.

In the comparison chart’s NO₂ view, each site is the mean over its frame minus the mean in a ring 30 to 60 km out, so a regional rise does not count. Morowali’s excess more than tripled, from about 20 µmol/m² in 2019 to 67 in 2025. Weda Bay went from nothing to about 21, and Obi from 1 to 8. And Sorowako, the oldest nickel operation of the six, shows no excess at all: Vale runs its smelter on hydropower from three dams on the Larona River.

What the pictures do not show

A median composite is a picture of a typical day, so things that come and go are missing: smoke, the red runoff that turns the sea off Weda Bay and Kawasi after heavy rain, and ships. The cleared-land measure counts towns and roads as well as pits, and a pit that is replanted, or a roof that is green, stops counting. It is a measure of how much of the frame is no longer forest or water, not of nickel. The frames are also only as big as the parks: much of the mining that feeds them happens in concessions tens of kilometres away, which other people have mapped better than a fixed square can.

How it was made

Everything is computed in Google Earth Engine by Python scripts in the open satellite-images repository, which also builds the haze maps. For each site and year it takes the median of every Landsat 8 and 9 surface-reflectance pixel that the quality band marks as clear of cloud, cirrus and shadow, fills any gap from the clear pixels of the years around it, and downloads a true-colour thumbnail. A pixel counts as cleared when its NDVI is under 0.3, its modified water index is under zero and its shortwave infrared reflectance is over 0.1. The last test matters: hazy, sediment-laden sea can pass the first two, and without it the measure jumps in the haziest years. Scenes more than half cloud are left out, and the cloud mask is grown by 60 m, because over Halmahera the quality band misses enough cloud to paint white blobs into a composite that would then count as cleared. Two more checks catch what is left. A pixel that is bright blue in one scene is dropped unless it is bright in most scenes that year, as a roof is. And a pixel that is bright in one year’s picture but not in the following three years’ is taken to be cloud and replaced by those years’ view, because a roof, once built, stays. The year-cleared overlay marks the first year a pixel was cleared and was still cleared the year after, so a single bad composite cannot add a ring.

The NO₂ map is the annual mean of the offline Level-3 tropospheric column on a 0.05° grid, and the site values are the mean over each frame minus the mean in a ring 30 to 60 km out. Night lights are the Earth Observation Group’s annual VIIRS composites: for each pixel, the median of the year’s cloud-free nights, with fires, gas flares and other short-lived light masked out, summed over the frame.

Data

  • Landsat 8 and 9 Collection 2 Level-2 surface reflectance (LANDSAT/LC08/C02/T1_L2, LANDSAT/LC09/C02/T1_L2), courtesy of the U.S. Geological Survey.
  • Copernicus Sentinel-5P TROPOMI offline NO₂ (COPERNICUS/S5P/OFFL/L3_NO2), ESA.
  • VIIRS Day/Night Band annual composites, VNL v2 (NOAA/VIIRS/DNB/ANNUAL_V21, NOAA/VIIRS/DNB/ANNUAL_V22), Earth Observation Group, Payne Institute.
  • Mine production: USGS Mineral Commodity Summaries, nickel, 2015–2026 editions.
  • Captive coal: CREA and Global Energy Monitor, Indonesia captive coal in 2025 (February 2026), and CREA’s August 2026 NOx analysis.

The code is in satellite-images: scripts/nickel_export.py for the frames and cleared land, scripts/nickel_air.py for NO₂ and night lights, and scripts/nickel_blog.py to package them; make nickel, make nickel-air and make nickel-blog run them. A full run takes over an hour, most of it Earth Engine building composites over Halmahera, where a cloud-free year needs fifty-odd scenes and the requests sit close to its memory limit.